[1]. Antonio, G.; & Froeseb, T. (2012). The Application of Project Management Standards and Success Factors to the Development of a Project Management Assessment Tool. (26th IPMA World Congress, Crete, Greece).
[2]. Bassiony, M.S.; El-Karim, M.; El Nawawy, O.; & Abdel-Alim, M.A. (2019). Identification and assessment of risk factors affecting construction projects. HBRC Journal, 13(2), 202-216. doi:https://doi.org/10.1016/j.hbrcj.2015.05.001.
[3]. Beheshtinia, M.A.; & Moghimi, M. (2010). Analyzing the Impact of Multi-site Manufacturing on Increasing the Organization Capabilities in Reducing Hazards and Vulnerability of Supply Chain. Environmental Hazards Management, 2(2), pp: 141-156.
[4]. Beheshtinia, M. A.; & Moghimi, M. (2017). Injured transportation quality enhancement during natural disaster from the various geographical zones. Human Geography Research Quarterly, 49(3), pp: 539-551.
[5]. Chang, D.Y. (1992). Extent Analysis and Synthetic Decision, Optimization Techniques and Applications. World Scientific, Singapore.
[6]. Dziadosz, A.; Rejment, M. (2016). Risk Analysis in Construction Project - Chosen Methods. Procedia Engineering, 122, pp: 258-265. doi:https://doi.org/10.1016/j.proeng.2015.10.034.
[7]. Ebrahimnejad, S.; Mousavi, S. M.; & Seyrafianpour, H. (2010). Risk identification and assessment for build–operate–transfer projects: A fuzzy multi attribute decision making model. Expert Systems with Applications, 37(1), 575-586. doi:http://dx.doi.org/10.1016/j.eswa.2009.05.037.
[8]. EcemYildiz, A.; Dikmen, I.; & Birgonul, M.T. (2014). Using Expert Opinion for Risk Assessment: A Case Study of a Construction Project Utilizing a Risk Mapping Tool. Procedia - Social and Behavioral Sciences, 119, 519-528. doi:https://doi.org/10.1016/j.sbspro.2014.03.058.
[9]. Gogus, O.; & Boucher, T. O. (1998). Strong transitivity, rationality and weak monotonicity in fuzzy pairwise comparisons. Fuzzy Sets and Systems, 94(1), 133-144. doi:http://dx.doi.org/10.1016/S0165-0114(96)00184-4.
[10]. Khatibi, S.A.M.; Moghimi, M.; & Abdolshah, M. (2018). Scheduling production and transportation in multi-site supply chain simultaneously regarding to exclusive suppliers. Journal of Industrial and Systems Engineering, 11(4), pp: 170-189.
[11]. Klein, J. H.; & Cork, R. B. (1998). An approach to technical risk assessment1. International Journal of Project Management, 16(6), pp: 345-351. doi:http://dx.doi.org/10.1016/S0263-7863(98)00006-4.
[12]. Lyons, T.; & Skitmore, M. (2004). Project risk management in the Queensland engineering construction industry: a survey. International Journal of Project Management, 22(1), 51-61. doi:http://dx.doi.org/10.1016/S0263-7863(03)00005-X.
[13]. McDermott, R.; Mikulak, R.; & Beauregard, M. (1996). The Basics of FMEA. Quality Resources: Productivity Press, New York, New York, USA.
[14]. McDermott, R.; Mikulak, R. J.; & Beauregard, M. (2009). The basics of FMEA (2 ed.): CRC Press.
[15]. Moghimi, E. (2013). Why hazards science? Environmental Hazards Management. 1(1), pp: 1-3. doi:https://dx.doi.org/10.22059/jhsci.2014.52605.
[16]. Moghimi, M.; Khatibi, S.A.M.; & Abdolshah, M. (2016). Implementation of Total Quality Management Systems Reducing Vulnerability in Banking Industry. Environmental Hazards Management, 3(1), pp: 33-46. doi:https://dx.doi.org/10.22059/jhsci.2016.59273.
[17]. Mojtahedi, S. M. H.; Mousavi, S. M.; & Makui, A. (2010). Project risk identification and assessment simultaneously using multi-attribute group decision making technique. Safety Science, 48(4), pp: 499-507. doi:
http://dx.doi.org/10.1016/j.ssci.2009.12.016.
[18]. PMBOK. (2008). A Guide Project Management Body of Knowledge (PMBOK® GUIDE). Paper presented at the Project Management Institute.
[19]. PMBOK. (2013). A Guide to the Project Management Body of Knowledge (PMBOK® Guide)—Fifth Edition. Project Management Journal, 44(3).
[20]. Renier, J.; Domingo, T.; Theresa, M.; DePano, S.; Dominic Aily G.; EcatNicole Ann D.; Sanchez, G.; & Custodio, B.P. (2015). Risk Assessment on Filipino Construction Workers, procedia Manufacturing, 3, pp: 1854-1860. doi:https://doi.org/10.1016/j.promfg.2015.07.226.
[21]. Satty, T.L. (1996). The Analytic network process - Decision making with Dependence and Feedback. RWS publications.
[22]. Salehi sedgheyani, J. (2010). Provide a method for ranking risks of project activities based on CPM networks using fuzzy and fuzzy TOPSIS methods. Journal of Industrial Management, 1, pp: 69-82.
[23]. Samantra, C.; Datta, S.; & Mahapatra, S.S. (2017). Fuzzy based risk assessment module for metropolitan construction project: An empirical study, Engineering Applications of Artificial Intelligence, 65, pp: 449-464. doi:https://doi.org/10.1016/j.engappai.2017.04.019.
[24]. Taylan, O.; O.Bafail, A.; M.S.Abdulaal, R.; & R.Kabli, M. (2014). Construction projects selection and risk assessment by fuzzy AHP and fuzzy TOPSIS methodologies, Applied Soft Computing, 17, pp: 105-116. doi:https://doi.org/10.1016/j.asoc.2014.01.003.
[25]. Turskis, Z.; & Zavadskas, E. K. (2010). A new fuzzy additive ratio assessment method (ARAS‐F). Case study: The analysis of fuzzy multiple criteria in order to select the logistic centers location. Transport, 25(4), pp: 423-432. doi:10.3846/transport.2010.52.
[26]. Wang Z.; & Chen, C. (2017). Fuzzy comprehensive Bayesian network-based safety risk assessment for metro construction projects. Tunnelling and Underground Space Technology, 70 ,pp: 330-342. doi:https://doi.org/10.1016/j.tust.2017.09.012.
[27]. Yao-Chen, Kuo; & Shih-Tong, Lu (2013).Using fuzzy multiple criteria decision making approach to enhance risk assessment for metropolitan construction projects, International Journal of Project Management, 31(4), 602-614.doi:https://doi.org/10.1016/j.ijproman.2012.10.003.
[28]. Yaqiong, L.; Man, L. K.; & Zhang, W. (2011). Fuzzy theory applied in quality management of distributed manufacturing system: A literature review and classification. Engineering Applications of Artificial Intelligence, 24(2), pp: 266-277. doi:http://dx.doi.org/10.1016/j.engappai.2010.10.008.
[29]. Zayed, T.; Amer, M.; & Pan, J. (2008). Assessing risk and uncertainty inherent in Chinese highway projects using AHP. International Journal of Project Management, 26(4), pp: 408-419. doi:http://dx.doi.org/10.1016/j.ijproman.2007.05.012.